Skip to content

Additions & Renovations Phase II

CAMPUSPROJECT DESCRIPTIONPROCUREMENT METHODTIMELINE
I. ADDITION & RENOVATIONS DISTRICT-WIDE
JB Alexander High SchoolNew Band Hall Building, ROTC and CATE, Ag. Sci. ShopCMAR: Leyendecker Architect: MunozJune 2015 – July 2017
Clark Middle SchoolBand Hall expansion/ EMS ReplacementCMAR: Leyendecker Architect:Pena/HickeyJune 2015 – August 2016
Clark MiddleReplace EMS SystemCSP Engineer: DBR EngineeringJune 2016 – August 2017
Newman Elementary SchoolCafeteria Expansion, enclose canopy to Classroom WingCMAR: Zertuche Co. Architect:Design Group InternationalJune 2015 – July 2016
Arndt Elementary School16 classroom wing addition, parking lot expansion, drainage improvementsCMAR: Leyendecker Architect: Frank ArchitectsJune 2015 – August 2016
Trautmann Elementary16 classroom wing addition, HVAC/EMS Replacement, and enclose main entrance canopy/plazaCMAR: Leyendecker Architect: MunozJune 2015 – August 2016
United South High SchoolRenovate existing science labs, install wood flooring in gym, replace existing clock systemCMAR: Leyendecker Architect: MunozJune 2016 – August 2017
United South High SchoolRenovate existing science labs, install wood flooring in gym, replace existing clock systemCMAR: Leyendecker Architect: MunozJune 2016 – August 2017
Dellano ElementaryReplace HVAC and EMS SystemsCSP Engineer:DBR EngineeringJune 2016 – August 2016
Kazen ElementaryReplace HVAC and EMS SystemsCSP Engineer:DBR EngineeringJune 2016 – August 2016
Juarez-Lincoln ElementaryReplace HVAC and EMS SystemsCSP Engineer:DBR EngineeringJune 2016 – August 2016
Prada Elementary SchoolReplace HVAC and EMS SystemsCSP Engineer:DBR EngineeringJune 2016 – August 2016
Ruiz Elementary SchoolReplace HVAC and EMS SystemsCSP Engineer:DBR EngineeringJune 2016 – August 2016
United 9th GradeReplace HVAC and EMS SystemsCSP Engineer:DBR EngineeringJanuary 2016 – August 2017
Brantely Hall Bldg.Replace HVAC and EMS SystemsCSP Engineer:DBR EngineeringJune 2016 – August 2016
Clark Middle, Finley ES, Perez ES, Prada ES, Roosevelt ES, Trautmann ES, Gonzalez MS, Los Obispos MS, S.Garcia MS, Trautmann MS, Washington MS, Alexander HS, United South HSReplace Fire Alarm SystemCSP Engineer: DBR EngineeringJune 2016 – August 2017
Finley ES, Gutierrez ES, Juarez-Lincoln ES, Kazen ES, Kennedy-Zapata ES, Newman ES, Perez ES, Prada ES, Salinas ES, Trautmann ES, Los Obispos MS, Trautmann MS, Trautmann 6th, United MS, United South MS, Washington MS, United South HS, United 9th GradeReplace Fire Alarm SystemCSP Engineer: DBR EngineeringJune 2016 – August 2017
Gutierrez ES, Perez ES, Salinas ES, Trautmann ES, Trautmann MS, Washington MSReplace Public Address SystemCSP Engineer:DBR EngineeringJune 2016 – August 2017
Food Production CenterExpand food storage areaCMAR CMAR: Leyendecker Architect: PenaJune 2015 – August 2016
II. SAFETY & SECURITY UPGRADES DISTRICT -WIDE
All Campuses District-WideBuild security stations at all main entrances to house security guard and control access systemCSP Architect: MunozJune 2015 – Aug 2017
All Campuses District-WideInstall building access control at all exterior perimeter doors, card reader locking systemRFP No Consultant RequiredJune 2015 – Aug 2017
Elementary Schools District-WideUpgrade security surveillance camera systemRFP No Consultant RequiredJune 2015 – Aug 2017